Freshways Milk Head Quarters in North London. London Glass Partitions were contracted to supply and install new glass meeting rooms to match their existing setup.
Understanding the customer's requirements LGP was able to retrofit new glass partitions to suit the existing.
The new glass system comprised of a frameless glass partition system, 10mm clear toughened glass and frameless glass doors, installed into our slimline perimeter glazing tracks.
Due to the height of the existing ceiling, we reduced the frameless glass doors and introduced corner patch fittings and glass over panel, to reduce deflection in the glass doors.
Each glass door is self-closing, using a hydraulic self-close floor pivot, reducing the need to cut large apertures into the customer polished concrete floor.
Client testimonial
''Fantastic! Very happy with the new offices.'Glad we found this new company. From the guy that came to do the survey to the installation team we felt very relaxed that we were good hands. I can recommend to anyone
this glazing company'.
- Jay, Director